Structural Refurbishment :: Concrete Repairs :: Inspection / Survey / Testing :: Flooring / Deck Reinstatement :: Joint Sealing :: Surface Preperation / Grit Blasting :: Protective / Decorative Coatings :: Resin Injection :: Specialist Waterproofing Systems
concrete refurbishment home
history and Objectives
Quality
Concrete Repair
Building Refurbishment
Waterproofing
Survey and Testing
Newsletter
Contact
Concrete Refurbishment and Repair

Case Study 2

<< Back to case studies

KENNEDY TOWER

Kennedy Tower is a 20-storey office block in Birmingham city centre. The building underwent major refurbishment works to the external elevations.

The concrete façade was coated with a stone grit mineralite which required removing prior to the concrete repairs.

A high performance levelling mortar was applied to all concrete surfaces prior to the application of a three coat anti-carbonation system.


Home | History & Objectives | Quality |Concrete Repair |Building Refurbishment | Waterproofing | Survey and Testing | News Letter & Links | Case Studies | Contact Us | News | Associated Websites | Terms | Privacy
committed to CSCS
A Churchill Steeplejack UK Ltd. Company

Code, Layout, Design ©2004 Eventure Internet Ltd
web design company elearning ecommerce website designers
Copyright © Churchill refurbishment concrete repairs