Concrete Repairs on Railway Bridge
06 August 2009
Churchill Refurbishment are to carry out concrete repairs on the Railway Bridge at Cleveland Potash. Operative carried out the concrete condition survey w/c 7th July. Works are to include breaking out all loose and defective concrete to a sound surface, reinstate concrete repairs using a lightweight cementitious repair mortar to match existing profile, coat all surfaces in an anti-carbonation coat to prevent further deterioration, and then coat low level areas in anti graffiti paint.
|
|