 |
| |
|
| |
|
|
|
|
Welcome to the latest news page. Please click on one of the articles for more details.
| 687 news articles found. Showing 1 to 30. | Back | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Next |
Concrete Repair Works on two Bridges at Cleveland
28 October 2009
Churchill Refurbishment are to commence concrete repairs on the 1st of two Railway Bridges at Cleveland Potash on Wednesday 28th October 2009. The repair works are a follow on from the condition surve...
|
| |
|
|
Concrete Repairs at Food Factory
14 October 2009
Churchill Refurbishment are to carry out concrete repairs to a external yard at a food factory. Works are to consist of saw cutting to clean edge perimeter of repair area, remove loose and debonded co...
|
| |
|
|
Concrete Repair Works on two Bridges at Cleveland
09 October 2009
Churchill Refurbishment have been awarded the contact to carry out concrete repairs on two railway bridges at Cleveland Potash. The repair works are a follow on from the condition surveys which were c...
|
| |
|
|
Tactile Hammer Test Survey at RAF Valley
23 September 2009
Churchill Refurbishment are to conduct a tactile hammer test survey to Gaydan Hanger and Station Ops building at RAF Valley in Anglesey. The concrete repair works are to be carried out after the surve...
|
| |
|
|
Window Repair Works at Litchurh Plaza, Derby.
04 September 2009
Churchill Refurbishment are to commence window repair works damaged by a water leak at Litchurh Plaza in Derby. Operative are to use bosun seats to allow access down the outside of the building and a...
|
| |
|
|
Concrete Repairs on Railway Bridge
06 August 2009
Churchill Refurbishment are to carry out concrete repairs on the Railway Bridge at Cleveland Potash. Operative carried out the concrete condition survey w/c 7th July. Works are to include breaking out...
|
| |
|
|
Window Head Repairs at Chetwynd Barracks, Chilwell
20 July 2009
Churchill Refurbishment are to carry out window head repairs at Chetwynd Barracks, Chilwell. Works are to include, removing loose and delaminated concrete break back to sound concrete, treat embedded ...
|
| |
|
|
Extensive Concrete Repairs at Mistley Malting
13 July 2009
Please see before and after photos of Mistley Malting, Colchester.
Works consisted of the following: Sheet out and seal underside of floor to prevent dust contaminating grain storage area, break ou...
|
| |
|
|
Concrete Condition Survey on a Railway Bridge
07 July 2009
Churchill Refurbishment are to carry out a Concrete Condition Survey on a Railway Bridge at Cleveland Potash. Access for works will be via a transit van mounted cherry picker, Operatives are to hammer...
|
| |
|
|
Churchill Refurbishments Commitment to Training
03 July 2009
Nine employees from Churchill Refurbishment have now completed various training courses in the last week. Training courses consisted of CCNSG (Passport to safety) IPAF (mobile boom and scissor lift). ...
|
| |
|
|
Refractory Linning Repairs at Cleveland Potash
29 June 2009
Churchill Refurbishment have now completed Refractory Repairs on a dryer unit at Cleveland Potash using gunite spray material. Works consisted of 3No courses of bricks laid at the mouth of the firing ...
|
| |
|
|
Training at Churchill Refurbishment Ltd
24 June 2009
As the on going training for field operatives at Churchill Refurbishment continues, nine operatives are to undergo various training this week. Training courses are to consist of CCNSG (Passport to saf...
|
| |
|
|
Concrete Repairs to a Fire Damaged Retaining Wall
01 June 2009
Churchill Refurbishment are to commence extensive concrete repairs to a fire damaged retaining wall in Huddersfield. Operative carried out a survey for tensile testing on reinforcing bars last week. W...
|
| |
|
|
Concrete Floor Repairs at Toyota, Derby
22 May 2009
Churchill Refurbishment are to commence concrete floor repairs at the New Waste Management Facility for Toyota in Burnaston, Derby. Works are due to start Tuesday 26th May and be completed during the ...
|
| |
|
|
Extensive Concrete Repairs at Mistley Malting
28 April 2009
Churchill Refurbishment: Extensive concrete repairs are well under way at Mistley Malting, Colchester. Works commenced on the 1st April and is expected to take approximately 6 weeks to complete.
|
| |
|
|
Extensive Concrete Repairs at Mistley Malting
30 March 2009
Churchill Refurbishment Ltd are pleased to be awarded the contract to carry out extensive concrete repairs at Mistley Malting, Colchester. Works are to commence the 1st April and is expected to take a...
|
| |
|
|
|
|
|
|
|
|
 |
|